Energising your Operations
GSK
GSK House, Brentford (Head Office) • Weybridge • Stevenage • Ware • Harlow • Stockley Park
Consistent project works since 2011
-
LED Lighting Upgrade
-
Simmtronic Lighting Control Upgrade
-
Lutron Car Park Lighting Control
-
Electrak Underfloor Track Installations
-
UPS Installation
-
EV Chargers
-
Distribution Board Upgrades
-
LV Panel Upgrades
-
Car Park & External Lighting Upgrade
-
Switchable Glass
-
Upgrade to RCD Protection at Desk Level
-
Powered Doors for Disabled Access
-
Power for site-wide Cisco Video Conferencing
GSK Excellence Centre
Brentford, Middlesex
-
LED Lighting Throughout
-
Dynalite Lighting Control
-
AMX Control Integration
-
RGBW Feature Lighting
-
Bespoke Lighting for 12no Testing Rooms with Main Panel Indication
-
2no 100kVA UPS / 1no 500kVA UPS
-
Coordination of Uprated UKPN Incoming Supply
-
Power to Swimming Pool & Associated Plant
-
Sports Lighting to Achieve 1200 lux to Running Track & Small Football Pitch
-
Flush Fitting Floorboxes to Multiple Surfaces, including Tile & Running Track Material
-
LV Panel Installation with Non-essential, Essential, and Critical Sections
-
External Lighting
-
Switchable Glass
-
Full Containment Installation for Multiple Cable Classes, including Power, Data, AV, and Fire Alarm
-
Lighting to Stretch Fabric for Daylight Replication
Full Design & Build Project (14 months)
Microsoft London
Kingdom Street, London
Lighting Control Upgrade, Multiple Floors
-
LED Lighting Installation
-
Installation of new Dynalite Lighting Control Modules
-
New Bus Cable Installed
-
New Head End
-
Sensors Linked to Dynalite Network
-
Scene Plates Linked to Dynalite Network
-
New Area Controllers
-
Vertical CAT6 Cabling to Link Area Controllers
-
Bespoke Steel Plates to allow Secure Mounting within Ceiling Void
Orbital Fasteners
Watford
-
Conversion to a TT Earthing System on 5no Units
-
Upgrade of all Distribution Boards to accept DP RCBO's
-
Assistance & Full AC Installation for 510kW (total) Solar Installation
-
LED Lighting Upgrade
-
100kVA Generator Install
-
20kVA UPS Installation
-
Warehouse LED Low Bay Lighting
-
Loading Bay Curtain Heaters
-
Single Mode Fibre Installation across road with Chapter 8 Coordination & Council Permissions
-
Multimode Fibre Backbone over 5no Units
-
External Lighting for Signage & Car Park Areas
-
5-yearly EICR
-
Emergency Lighting Testing
Project Works
Lazard Asset Management
Stratton Street, London
Project Works
-
LED Lighting Upgrade
-
Dynalite Lighting Control Upgrade
-
Electrak Underfloor Track Installations
-
UPS Installation
-
EV Charger
-
Distribution Board Upgrades
-
LV Panel Upgrade
-
IR Toilet Flush Installation
-
Upgrade to RCD Protection at Desk Level
-
Power for Site-wide Cisco Video Conferencing
-
10no Commercial DIshwasher Installation
-
Motorised Blackout Blinds for Meeting Rooms, with Dynalite Integration to Touch Panel
-
Server Room Decommission
-
Lutron Lighting Control
-
5-yearly EICR
-
Emergency Lighting Testing
Cisco
Bedfont Lakes, Feltham
Project Works
-
LED Lighting Upgrade
-
RCD Upgrade at Desk Level
-
UPS Installation
-
High Output Comms Cabinet Power Supplied
-
Power to AV Systems
-
Lutron Lighting Control to Meeting Rooms
-
Distribution Board Upgrade
-
PAT Testing
-
5-yearly EICR
-
Emergency Lighting Testing
-
Sub-main & Associated Containment in the Basement Car Park for UPS